Lydney level crossing

CCTV-monitored manual barrier level crossing on the Wales route (ELR SWM2).

predicted
OPEN
for the next 30 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 04:54–06:08 → 74m
Under the hood
Mon 07 Sep · 04:54
Today Tomorrow

Trains in window

04:49 🚛 6M27 Cardiff Tidal T.C.Saltley Dunns Siding Up (SW → NE) no show
🚛Freight
now 04:54:27 · 78 avg · 1 in window
live observation: 2 up · 2 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,716 active · 21,545 delays · 2,956 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Lydney crossing is predicted to be closed for about 3 h 52 min between 06:00 and 22:00, across roughly 51 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (01:13–01:16, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:55–10:55 in the morning and around 12:58–13:58 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Lydney is a cctv-monitored manual barrier crossing (CCTV) on the Gloucester–Llanwern Exchange Sdgs line (Wales route · ELR SWM2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 413 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 96.0% of the warnings we could verify came true.

Typical timing error was ±3s (9 in 10 within 36s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?