St. Mary's level crossing

Manual gate level crossing on the Western route (ELR SWM1).

predicted
OPEN
for 27 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 30 min · 1 min late

Next 30 min

OPEN 11:10–11:37 27m
CLOSED 11:37–11:40 → 3m
Under the hood
Mon 07 Sep · 11:10
Today Tomorrow

Trains in window

11:06 🚄 1G09 London PaddingtonCheltenham Spa Down (E → W) +13 min
11:40 🚄 1L72 Cheltenham SpaLondon Paddington Up (W → E) +1 min
🚄Express passenger
now 11:10:11 · 41 avg · 2 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,732 active · 30,457 delays · 3,241 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, St. Mary's crossing is predicted to be closed for about 2 h 25 min between 06:00 and 22:00, across roughly 35 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (05:26–05:29, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:37–08:37 in the morning and around 20:41–21:41 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

St. Mary's is a manual gate crossing (MGH) on the Swindon–Stroud line (Western route · ELR SWM1). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 63 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 95.7% of the warnings we could verify came true.

Typical timing error was ±7s (9 in 10 within 90s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?