Appleby level crossing

Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR DOW).

predicted
OPEN
for the next 30 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 02:11–02:55 → 44m
Under the hood
Mon 07 Sep · 02:11
Today Tomorrow

Trains in window

02:08 🚛 6T18 Immingham B.S.C. Ore TmlSanton F.O.T. Down (E → W) active
🚛Freight
now 02:11:04 · 114 avg · 1 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,282 active · 21,043 delays · 2,870 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Appleby crossing is predicted to be closed for about 5 h 21 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:03–00:07, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:52–08:52 in the morning and around 12:54–13:54 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Appleby is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Barnetby Sdgs Colas Rail–Scunthorpe Trent T.C. line (North and East route · ELR DOW). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 481 trains through this crossing.

99.4% of observed passes were being warned about on this page when they passed, and 98.5% of the warnings we could verify came true.

Typical timing error was ±3s (9 in 10 within 431s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?