New Barnetby level crossing

CCTV-monitored manual barrier level crossing on the North and East route (ELR MAC3).

predicted
OPEN
for 3 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš› in 7 min Β· 5 min late

Next 30 min

OPEN 10:00–10:02 3m
CLOSED 10:02–10:07 5m
OPEN 10:07–10:18 11m
CLOSED 10:18–10:21 2m
MAY OPEN 10:21–10:22 2m
CLOSED 10:22–10:25 3m
OPEN 10:25–10:30 β†’ 4m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

09:51 πŸš„ 1B73 Cleethorpes β†’ Liverpool Lime Street HL/ML Down (E β†’ W) +1 min
09:56 πŸšƒ 4R49 Drax Power Station β†’ Immingham Biomass LP (DBS) Up (W β†’ E) -2 min
10:07 πŸš› 6K22 Santon F.O.T. β†’ Immingham B.S.C. Ore Tml Up (W β†’ E) approaching
10:20 πŸš› 6T23 Immingham B.S.C. Ore Tml β†’ Santon F.O.T. Down (E β†’ W) active
10:25 πŸš„ 1B68 Liverpool Lime Street HL/ML β†’ Cleethorpes Up (W β†’ E) on time
10:31 πŸš† 2A20 Cleethorpes β†’ Matlock Down (E β†’ W) active
πŸš„Express passenger πŸš†Passenger πŸšƒEmpty stock πŸš›Freight
now 10:00:04 Β· 176 avg Β· 6 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, New Barnetby crossing is predicted to be closed for about 5 h 4 min between 06:00 and 22:00, across roughly 74 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.9 min (06:42–06:49, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:05–09:05 in the morning and around 13:16–14:16 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Caistor Road in Melton Ross, Lincolnshire.

New Barnetby is a CCTV-monitored manual barrier crossing (CCTV) on the Wrawby Jn Signal BD8850–Scunthorpe Trent T.C. line (North and East route · ELR MAC3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 513 trains through this crossing.

99.8% of observed passes were being warned about on this page when they passed, and 99.2% of the warnings we could verify came true.

Typical timing error was Β±2s (9 in 10 within 29s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?