Habrough level crossing

Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR MAC3).

predicted
OPEN
for 4 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 7 min · 1 min late

Next 30 min

OPEN 07:11–07:15 4m
CLOSED 07:15–07:18 3m
OPEN 07:18–07:22 4m
CLOSED 07:22–07:25 3m
OPEN 07:25–07:29 4m
CLOSED 07:29–07:32 3m
OPEN 07:32–07:37 5m
CLOSED 07:37–07:40 3m
OPEN 07:40–07:43 → 3m
Under the hood
Mon 07 Sep · 07:11
Today Tomorrow

Trains in window

07:18 🚆 2F81 CleethorpesBarton-on-Humber Down (E → W) approaching
07:25 🚄 1B62 SheffieldCleethorpes Up (W → E) -1 min
07:32 🚆 2A14 Grimsby TownMatlock Down (E → W) active
07:40 🚆 2J43 NottinghamGrimsby Town Up (W → E) -1 min
🚄Express passenger 🚆Passenger
now 07:11:59 · 62 avg · 4 in window
live observation: 2 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,149 active · 25,034 delays · 3,028 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Habrough crossing is predicted to be closed for about 4 h 27 min between 06:00 and 22:00, across roughly 58 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (06:22–06:26, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:47–07:47 in the morning and around 12:42–13:42 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Habrough is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Stallingborough–Barton-on-Humber line (North and East route · ELR MAC3). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 46 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.6% of the warnings we could verify came true.

Typical timing error was ±11s (9 in 10 within 136s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?