Aspley Guise level crossing

CCTV-monitored manual barrier level crossing on the West Coast South route (ELR BBM).

predicted
OPEN
for 8 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 11 min · running

Next 30 min

OPEN 06:16–06:24 8m
CLOSED 06:24–06:27 3m
OPEN 06:27–06:39 12m
CLOSED 06:39–06:42 3m
OPEN 06:42–07:27 → 45m
Under the hood
Wed 11 Nov · 06:16
Today Tomorrow

Trains in window

06:27 🚆 2S03 Bletchley → Bedford Down (W → E) approaching
06:42 🚆 2S02 Bedford → Bletchley Up (E → W) +1 min
🚆Passenger
now 06:16:32 · 54 avg · 2 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,686 active · 31,193 delays · 1,990 cancelled · 0 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Aspley Guise crossing is predicted to be closed for about 2 h 21 min between 06:00 and 22:00, across roughly 34 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (05:25–05:28, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:28–10:28 in the morning and around 19:29–20:29 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Salford Road in Woburn Sands, Bedfordshire, next to Aspley Guise station.

Aspley Guise is a CCTV-monitored manual barrier crossing (CCTV) on the Bletchley–Ridgmont line (West Coast South route · ELR BBM). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 248 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±12s (9 in 10 within 76s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?