OPEN 06:50–06:52 2m
CLOSED 06:52–06:56 4m
OPEN 06:56–07:01 5m
CLOSED 07:01–07:05 3m
OPEN 07:05–07:16 12m
CLOSED 07:16–07:20 3m
OPEN 07:20–07:28 β†’ 8m
Under the hood
Mon 12 Oct Β· 06:50
Today Tomorrow

Trains in window

06:49 πŸš† 2T10 Strood β†’ Paddock Wood Down (W β†’ E) on time
06:55 πŸš„ 1T91 Maidstone West β†’ St. Pancras International Up (E β†’ W) active
06:56 ❓ 0Z48 Hoo Junction Up Yard β†’ Paddock Wood Keylands Sdgs Down (W β†’ E) -2 min
07:04 πŸš† 2T11 Paddock Wood β†’ Strood Up (E β†’ W) on time
07:19 πŸš† 2T12 Strood β†’ Paddock Wood Down (W β†’ E) active
πŸš„Express passenger πŸš†Passenger ❓Other
now 06:50:11 Β· 85 avg Β· 5 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,647 active Β· 24,539 delays Β· 2,497 cancelled Β· 0 reconnects
Nearby crossings

All 234 crossings in Southern β†’

About this crossing

How often it closes

On today’s timetable, Aylesford crossing is predicted to be closed for about 5 h 54 min between 06:00 and 22:00, across roughly 73 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:06–07:06 in the morning and around 18:32–19:32 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Mill Hall near Ditton, Kent, next to Aylesford station.

Aylesford is a manually-controlled barrier crossing (MCB/MB) on the New Hythe–Allington Hanson Agg line (Kent route · ELR PWS2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 180 trains through this crossing.

99.4% of observed passes were being warned about on this page when they passed, and 38.5% of the warnings we could verify came true.

Typical timing error was Β±11s (9 in 10 within 42s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’