Cuxton level crossing

Manually-controlled barrier level crossing on the Kent route (ELR PWS2).

predicted
OPEN
for the next 30 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 02:10–03:16 → 66m
Under the hood
Mon 07 Sep · 02:10
Today Tomorrow

Trains in window

02:11 🚧 8Y71 Tonbridge Engineers SidingTonbridge Engineers Siding Down (NE → SW) no show
🚧Engineering
now 02:10:43 · 78 avg · 1 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,282 active · 21,043 delays · 2,870 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Cuxton crossing is predicted to be closed for about 4 h 40 min between 06:00 and 22:00, across roughly 58 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (01:40–01:43, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:26–07:26 in the morning and around 17:48–18:48 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Cuxton is a manually-controlled barrier crossing (MCB/MB) on the Strood–Halling line (Kent route · ELR PWS2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 214 trains through this crossing.

99.5% of observed passes were being warned about on this page when they passed, and 83.6% of the warnings we could verify came true.

Typical timing error was ±9s (9 in 10 within 43s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?