Gillingham level crossing

CCTV-monitored manual barrier level crossing on the Kent route (ELR VIR).

predicted
CLOSED
for 15s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 now · running

Next 30 min

CLOSED 04:55–04:55 15s
OPEN 04:55–04:58 3m
CLOSED 04:58–05:01 3m
OPEN 05:01–05:18 17m
CLOSED 05:18–05:22 3m
OPEN 05:22–05:26 → 4m
Under the hood
Mon 07 Sep · 04:55
Today Tomorrow

Trains in window

04:54 🚃 5P02 Gillingham E.M.U.D.Gillingham (Kent) Up (E → W) active
04:55 🚆 2U91 Gillingham (Kent)Sheerness-on-Sea Down (W → E) approaching
04:55 2K52 ?? Up (E → W) approaching
05:01 🚃 5T06 Gillingham E.M.U.D.Gillingham (Kent) Up (E → W) active
05:21 🚄 1F05 FavershamSt. Pancras International Up (E → W) active
🚄Express passenger 🚆Passenger 🚃Empty stock Other
now 04:55:01 · 248 avg · 5 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,718 active · 21,551 delays · 2,954 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Gillingham crossing is predicted to be closed for about 11 h 14 min between 06:00 and 22:00, across roughly 127 closures. The longest single predicted closure is 13 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.2 min (00:25–00:31, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:47–08:47 in the morning and around 17:46–18:46 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Gillingham is a cctv-monitored manual barrier crossing (CCTV) on the Gillingham (Kent)–Up line (Kent route · ELR VIR). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,685 trains through this crossing.

90.1% of observed passes were being warned about on this page when they passed, and 99.5% of the warnings we could verify came true.

Typical timing error was ±73s (9 in 10 within 169s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?