Beal level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM7).

predicted
CLOSED
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 1 min Β· 1 min early

Next 30 min

CLOSED 06:35–06:37 2m
OPEN 06:37–06:46 9m
CLOSED 06:46–06:50 3m
OPEN 06:50–06:54 5m
CLOSED 06:54–06:58 3m
OPEN 06:58–07:07 β†’ 9m
Under the hood
Wed 11 Nov Β· 06:35
Today Tomorrow

Trains in window

06:33 πŸš„ 9N05 Edinburgh β†’ Newcastle Up (NW β†’ SE) passed
06:37 πŸš„ 1E02 Edinburgh β†’ London Kings Cross Up (NW β†’ SE) approaching
06:49 πŸš„ 1V50 Edinburgh β†’ Plymouth Up (NW β†’ SE) +1 min
06:57 πŸš„ 1S00 Newcastle β†’ Edinburgh Down (SE β†’ NW) on time
πŸš„Express passenger
now 06:35:52 Β· 154 avg Β· 4 in window
live observation: 2 up Β· 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,697 active Β· 31,210 delays Β· 1,991 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Beal crossing is predicted to be closed for about 6 h 44 min between 06:00 and 22:00, across roughly 81 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 4.7 min (04:35–04:40, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:05–10:05 in the morning and around 15:40–16:40 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Holy Island Road in Beal Station, Northumberland.

Beal is a CCTV-monitored manual barrier crossing (CCTV) on the Chathill–Berwick-upon-Tweed line (East Coast route · ELR ECM7). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 792 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.0% of the warnings we could verify came true.

Typical timing error was Β±2s (9 in 10 within 15s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?