Smeafield level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM7).

predicted
CLOSED
for 3 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 now · on time

Next 30 min

CLOSED 07:11–07:15 3m
OPEN 07:15–07:30 16m
CLOSED 07:30–07:35 5m
OPEN 07:35–07:44 → 8m
Under the hood
Mon 07 Sep · 07:11
Today Tomorrow

Trains in window

07:12 🚄 1E80 EdinburghLondon Kings Cross Up (N → S) on time
07:15 🚄 1E03 EdinburghLondon Kings Cross Up (N → S) approaching
07:26 0E15 Millerhill S.S.Doncaster Down Decoy GBRF Up (N → S) no show
07:33 🚄 1S01 DoncasterEdinburgh Down (S → N) on time
07:35 🚛 4S99 Tees Dock BSC Export BerthGrangemouth TDG Down (S → N) -1 min
🚄Express passenger 🚛Freight Other
now 07:11:59 · 138 avg · 5 in window
live observation: 2 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,149 active · 25,034 delays · 3,029 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Smeafield crossing is predicted to be closed for about 6 h 55 min between 06:00 and 22:00, across roughly 83 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 4.8 min (06:04–06:09, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:36–11:36 in the morning and around 12:58–13:58 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Smeafield is a cctv-monitored manual barrier crossing (CCTV) on the Chathill–Berwick-upon-Tweed line (East Coast route · ELR ECM7). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 846 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.4% of the warnings we could verify came true.

Typical timing error was ±203s (9 in 10 within 239s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?