Lucker level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM7).

predicted
CLOSED
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 2 min Β· 3 min late

Next 30 min

CLOSED 09:58–10:00 2m
OPEN 10:00–10:13 13m
CLOSED 10:13–10:16 3m
MAY OPEN 10:16–10:17 43s
CLOSED 10:17–10:23 6m
OPEN 10:23–10:33 β†’ 11m
Under the hood
Thu 22 Oct Β· 09:58
Today Tomorrow

Trains in window

09:49 πŸš„ 1E08 Edinburgh β†’ London Kings Cross Up (NW β†’ SE) on time
09:49 πŸš„ 1S04 London Kings Cross β†’ Edinburgh Down (SE β†’ NW) +7 min
09:58 πŸš„ 9S09 Newcastle β†’ Edinburgh Down (SE β†’ NW) +5 min
10:00 πŸš„ 1V56 Glasgow Central High Level β†’ Plymouth Up (NW β†’ SE) +3 min
10:16 πŸš„ 9N09 Edinburgh β†’ Newcastle Up (NW β†’ SE) +4 min
10:20 πŸš„ 1S31 Birmingham New Street β†’ Edinburgh Down (SE β†’ NW) +6 min
10:22 πŸš„ 1E09 Edinburgh β†’ London Kings Cross Up (NW β†’ SE) +3 min
πŸš„Express passenger
now 09:58:36 Β· 156 avg Β· 7 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,697 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Lucker crossing is predicted to be closed for about 7 h 43 min between 06:00 and 22:00, across roughly 99 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:57–09:57 in the morning and around 18:19–19:19 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on the B1341 in Lucker, Northumberland.

Lucker is a CCTV-monitored manual barrier crossing (CCTV) on the Morpeth–Berwick-upon-Tweed line (East Coast route · ELR ECM7). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?