CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM7).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:48 | π 1S04 | London Kings Cross β Edinburgh Down (SE β NW) | +7 min |
| 09:50 | π 1E08 | Edinburgh β London Kings Cross Up (NW β SE) | on time |
| 09:56 | π 9S09 | Newcastle β Edinburgh Down (SE β NW) | +5 min |
| 10:00 | π 1V56 | Glasgow Central High Level β Plymouth Up (NW β SE) | +2 min |
| 10:17 | π 9N09 | Edinburgh β Newcastle Up (NW β SE) | +4 min |
| 10:19 | π 1S31 | Birmingham New Street β Edinburgh Down (SE β NW) | +6 min |
| 10:24 | π 1E09 | Edinburgh β London Kings Cross Up (NW β SE) | +3 min |
On todayβs timetable, Newham crossing is predicted to be closed for about 7 h 16 min between 06:00 and 22:00, across roughly 95 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:58β09:58 in the morning and around 18:21β19:21 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is in Newham, Northumberland.
Newham is a CCTV-monitored manual barrier crossing (CCTV) on the MorpethβBerwick-upon-Tweed line (East Coast route · ELR ECM7). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.