Christon Bank level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM7).

predicted
OPEN
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 5 min Β· on time

Next 30 min

OPEN 06:53–06:55 2m
CLOSED 06:55–06:58 3m
MAY OPEN 06:58–06:59 1m
CLOSED 06:59–07:06 7m
OPEN 07:06–07:15 10m
CLOSED 07:15–07:19 3m
OPEN 07:19–07:21 2m
CLOSED 07:21–07:27 β†’ 6m
Under the hood
Mon 12 Oct Β· 06:53
Today Tomorrow

Trains in window

06:45 πŸš„ 9N05 Edinburgh β†’ Newcastle Up (N β†’ S) +2 min
06:48 πŸš„ 1E02 Edinburgh β†’ London Kings Cross Up (N β†’ S) passed
06:49 πŸš„ 1S00 Newcastle β†’ Edinburgh Down (S β†’ N) passed
06:58 πŸš„ 1V50 Edinburgh β†’ Plymouth Up (N β†’ S) on time
07:04 πŸš› 4S99 Tees Dock BSC Export Berth β†’ Grangemouth TDG Down (S β†’ N) approaching
07:06 πŸš† 2A01 Chathill β†’ Newcastle Up (N β†’ S) active
07:18 πŸš„ 1E80 Edinburgh β†’ London Kings Cross Up (N β†’ S) +1 min
07:24 πŸš„ 1E03 Edinburgh β†’ London Kings Cross Up (N β†’ S) on time
πŸš„Express passenger πŸš†Passenger πŸš›Freight
now 06:53:13 Β· 138 avg Β· 8 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,660 active Β· 24,627 delays Β· 2,503 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Christon Bank crossing is predicted to be closed for about 7 h 23 min between 06:00 and 22:00, across roughly 102 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 8.4 min (06:42–06:51, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:25–07:25 in the morning and around 13:07–14:07 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on the B6347 in Christon Bank, Northumberland.

Christon Bank is a CCTV-monitored manual barrier crossing (CCTV) on the Morpeth–Berwick-upon-Tweed line (East Coast route · ELR ECM7). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 862 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.

Typical timing error was Β±3s (9 in 10 within 23s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?