CCTV-monitored manual barrier level crossing on the Scotland route (ELR STR1).
| 01:14 | 5T85 | 🚃 | LARGS → AYRRCSD | ← from Ayr C.S.D. | -2 min |
| 01:19 | 5K73 | 🚃 | AYRR → AYRRCSD | ← from Ayr C.S.D. | active |
On today’s timetable, Belmont crossing is predicted to be closed for about 2 h 27 min between 06:00 and 22:00, across roughly 31 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (00:33–00:37, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:18–07:18 in the morning and around 17:41–18:41 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Belmont is a cctv-monitored manual barrier crossing (CCTV) on the Ayr C.S.D.–Girvan line (Scotland route · ELR STR1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 381 trains through this crossing.
80.6% of observed passes were being warned about on this page when they passed, and 96.4% of the warnings we could verify came true.
Typical timing error was ±49s (9 in 10 within 540s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.