Berwick level crossing

Manually-controlled barrier with obstacle detection level crossing on the Sussex route (ELR KJE3).

predicted
OPEN
for 12s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 3 min · 17 min late

Next 30 min

OPEN 09:20–09:21 12s
CLOSED 09:21–09:25 5m
MAY OPEN 09:25–09:27 1m
CLOSED 09:27–09:30 3m
OPEN 09:30–09:43 13m
CLOSED 09:43–09:47 4m
OPEN 09:47–09:49 2m
CLOSED 09:49–09:54 → 4m
Under the hood
Mon 07 Sep · 09:20
Today Tomorrow

Trains in window

09:12 🚆 2U17 EastbourneBrighton Up (SE → NW) +3 min
09:19 🚄 1F17 OreLondon Victoria (C) Up (SE → NW) passed
09:24 🚄 1F08 London Victoria (C)Ore Down (NW → SE) approaching
09:25 🚄 1U13 OreBrighton Up (SE → NW) approaching
09:30 🚆 2U16 BrightonEastbourne Down (NW → SE) +3 min
09:46 🚄 1F19 EastbourneLondon Victoria (C) Up (SE → NW) active
09:47 🚄 1F10 London Victoria (C)Eastbourne Down (NW → SE) +9 min
09:52 🚄 1U22 BrightonOre Down (NW → SE) active
🚄Express passenger 🚆Passenger
now 09:20:54 · 131 avg · 8 in window
live observation: 2 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,494 active · 28,101 delays · 3,115 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Berwick crossing is predicted to be closed for about 7 h 12 min between 06:00 and 22:00, across roughly 101 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.9 min (06:57–07:04, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:47–08:47 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Berwick is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Lewes–Polegate line (Sussex route · ELR KJE3). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 877 trains through this crossing.

99.9% of observed passes were being warned about on this page when they passed, and 99.8% of the warnings we could verify came true.

Typical timing error was ±225s (9 in 10 within 270s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?