CCTV-monitored manual barrier level crossing on the Sussex route (ELR KJE3).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Hampden Park crossing is predicted to be closed for about 8 h 45 min between 06:00 and 22:00, across roughly 81 closures. The longest single predicted closure is 13 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:14–08:14 in the morning and around 15:04–16:04 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Hampden Park is a cctv-monitored manual barrier crossing (CCTV) on the Willingdon Jn–Eastbourne line (Sussex route · ELR KJE3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 1,582 trains through this crossing.
99.9% of observed passes were being warned about on this page when they passed, and 99.8% of the warnings we could verify came true.
Typical timing error was ±67s (9 in 10 within 432s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.