Manually-controlled barrier with obstacle detection level crossing on the Sussex route (ELR WJB).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:50 | π 1F21 | Ore β London Victoria (C) Up (E β W) | +2 min |
| 09:51 | π 1F08 | London Victoria (C) β Ore Down (W β E) | +14 min |
| 10:03 | π 2D22 | Eastbourne β Ashford International Down (W β E) | approaching |
| 10:15 | π 1U19 | Ore β Brighton Up (E β W) | +2 min |
| 10:22 | π 1U22 | Brighton β Ore Down (W β E) | +2 min |
| 10:31 | π 2D15 | Ashford International β Eastbourne Up (E β W) | -1 min |
On todayβs timetable, Wallsend crossing is predicted to be closed for about 6 h 24 min between 06:00 and 22:00, across roughly 82 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 7.0 min (09:43–09:50, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 08:20β09:20 in the morning and around 16:15β17:15 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Wallsend Road in Pevensey, East Sussex, next to Pevensey Bay station.
Wallsend is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Pevensey & WesthamβBexhill line (Sussex route · ELR WJB). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 809 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.1% of the warnings we could verify came true.
Typical timing error was Β±14s (9 in 10 within 119s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.