Automatic half-barrier level crossing on the Sussex route (ELR WJB).
| 01:09 | 5F71 | 🚃 | HASTING → EBOURNE | → from Hastings | on time |
On today’s timetable, Pevensey Sluice crossing is predicted to be closed for about 3 h 40 min between 06:00 and 22:00, across roughly 91 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 1.5 min (00:22–00:23, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:45–08:45 in the morning and around 19:08–20:08 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Pevensey Sluice is a automatic half-barrier crossing (AHB) on the Pevensey Bay–Hastings line (Sussex route · ELR WJB). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 777 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 98.5% of the warnings we could verify came true.
Typical timing error was ±61s (9 in 10 within 128s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.