Bishton level crossing

Manual gate level crossing on the Wales route (ELR SWM2).

predicted
CLOSED
for 54s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ now Β· 14 min late

Next 30 min

CLOSED 09:59–10:00 54s
MAY OPEN 10:00–10:02 2m
CLOSED 10:02–10:14 12m
OPEN 10:14–10:17 4m
CLOSED 10:17–10:21 3m
OPEN 10:21–10:25 4m
CLOSED 10:25–10:31 β†’ 6m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:52 πŸš† 2G54 Cardiff Central β†’ Cheltenham Spa Up (W β†’ E) +22 min
09:56 πŸš„ 1F11 Cardiff Central β†’ Portsmouth Harbour Up (W β†’ E) +7 min
09:56 πŸš† 2U08 Taunton β†’ Cardiff Central Down (E β†’ W) passed
09:58 πŸš› 6C92 Margam TC GBRF β†’ Portbury Auto Terminal GBF Up (W β†’ E) cancelled
10:00 πŸš„ 1B06 London Paddington β†’ Cardiff Central Down (E β†’ W) approaching
10:05 πŸš„ 1S43 Cardiff Central β†’ Edinburgh Up (W β†’ E) -1 min
10:08 πŸš„ 1L13 Cardiff Central β†’ London Paddington Up (W β†’ E) on time
10:09 πŸš„ 1V04 Nottingham β†’ Cardiff Central Down (E β†’ W) +1 min
10:13 πŸš› 4L33 Cardiff Wentloog IFT β†’ London Gateway Frghtliner Up (W β†’ E) -10 min
10:20 πŸš† 2C71 Cardiff Central β†’ Exeter St. David's Up (W β†’ E) active
10:27 πŸš„ 1F08 Portsmouth Harbour β†’ Cardiff Central Down (E β†’ W) on time
10:29 πŸš„ 1B07 London Paddington β†’ Swansea Down (E β†’ W) +10 min
10:30 πŸš† 2G56 Cardiff Central β†’ Cheltenham Spa Up (W β†’ E) active
πŸš„Express passenger πŸš†Passenger πŸš›Freight
now 09:59:39 Β· 301 avg Β· 13 in window
live observation: 1 up Β· 2 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western β†’

About this crossing

How often it closes

On today’s timetable, Bishton crossing is predicted to be closed for about 9 h 59 min between 06:00 and 22:00, across roughly 116 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 8.4 min (09:00–09:08, 5 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:44–11:44 in the morning and around 16:45–17:45 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Bishton Road in Bishton, Newport.

Bishton is a manual gate crossing (MG) on the Stoke Gifford IEP Depot–Llanwern Exchange Sdgs line (Wales route · ELR SWM2). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 1,260 trains through this crossing.

99.8% of observed passes were being warned about on this page when they passed, and 95.3% of the warnings we could verify came true.

Typical timing error was Β±1s (9 in 10 within 9s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?