Lime Kiln level crossing

CCTV-monitored manual barrier level crossing on the Wales route (ELR WVL).

predicted
OPEN
for 4 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 7 min · 2 min early

Next 30 min

OPEN 05:50–05:54 4m
CLOSED 05:54–05:58 3m
OPEN 05:58–06:31 → 34m
Under the hood
Fri 23 Oct · 05:50
Today Tomorrow

Trains in window

05:58 🚆 2N03 Cardiff Central → Ebbw Vale Town Up (SE → NW) approaching
🚆Passenger
now 05:50:54 · 67 avg · 1 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-22..2026-10-24
fetched 02:08:21
trust 34,367 active · 30,157 delays · 2,683 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Lime Kiln crossing is predicted to be closed for about 3 h 40 min between 06:00 and 22:00, across roughly 58 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:35–00:39, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:33–10:33 in the morning and around 14:04–15:04 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on The Darran in Risca, Caerphilly.

Lime Kiln is a CCTV-monitored manual barrier crossing (CCTV) on the Ebbw Vale Parkway–Up line (Wales route · ELR WVL). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 410 trains through this crossing.

99.8% of observed passes were being warned about on this page when they passed, and 98.5% of the warnings we could verify came true.

Typical timing error was ±13s (9 in 10 within 65s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?