CCTV-monitored manual barrier level crossing on the Wales route (ELR SWM2).
| 01:15 | 6H30 | 🚛 | LWERXSG → MRGMTC | → from Bridgend | no show |
| 01:26 | 6V62 | 🚛 | WVRMTST → MRGMTC | → from Bridgend | no show |
On today’s timetable, St. Fagans crossing is predicted to be closed for about 7 h 33 min between 06:00 and 22:00, across roughly 87 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 6.7 min (00:36–00:43, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:41–07:41 in the morning and around 18:43–19:43 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
St. Fagans is a cctv-monitored manual barrier crossing (CCTV) on the Canton C.S.D.–Bridgend line (Wales route · ELR SWM2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 6 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 95.0% of the warnings we could verify came true.
Typical timing error was ±42s (9 in 10 within 219s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.