Pontsarn level crossing

Automatic half-barrier level crossing on the Wales route (ELR SWM2).

predicted
OPEN
for 4 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 6 min Β· on time

Next 30 min

OPEN 09:59–10:03 4m
CLOSED 10:03–10:05 2m
OPEN 10:05–10:12 8m
CLOSED 10:12–10:14 2m
OPEN 10:14–10:15 1m
CLOSED 10:15–10:16 2m
OPEN 10:16–10:26 10m
CLOSED 10:26–10:28 2m
OPEN 10:28–10:36 β†’ 8m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:50 πŸš† 2N13 Maesteg β†’ Ebbw Vale Town Down (S β†’ N) on time
09:51 πŸš„ 1B05 London Paddington β†’ Swansea Up (N β†’ S) +5 min
09:54 πŸš„ 1W16 Milford Haven β†’ Manchester Piccadilly Down (S β†’ N) passed
09:55 πŸš› 6R79 Newport Docks β†’ Margam T.C. Up (N β†’ S) cancelled
10:04 πŸš„ 1L14 Swansea β†’ London Paddington Down (S β†’ N) approaching
10:13 πŸš„ 1B38 Cardiff Central β†’ Fishguard Harbour Up (N β†’ S) active
10:14 πŸš› 6H25 Margam T.C. β†’ Llanwern Exchange Sdgs Down (S β†’ N) cancelled
10:16 🚧 3S62 Stormy β†’ Port Talbot Up Sidings Down (S β†’ N) -4 min
10:27 πŸš† 2B52 Pembroke Dock β†’ Cardiff Central Down (S β†’ N) +1 min
πŸš„Express passenger πŸš†Passenger πŸš›Freight 🚧Engineering
now 09:59:09 Β· 195 avg Β· 9 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,698 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western β†’

About this crossing

How often it closes

On today’s timetable, Pontsarn crossing is predicted to be closed for about 4 h 51 min between 06:00 and 22:00, across roughly 115 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.9 min (09:01–09:05, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:15–09:15 in the morning and around 17:27–18:27 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Pont Sarn Lane near Pendoylan, Vale of Glamorgan.

Pontsarn is a automatic half-barrier crossing (AHB) on the Down–Leckwith Loop North Jn line (Wales route · ELR SWM2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 753 trains through this crossing.

99.9% of observed passes were being warned about on this page when they passed, and 97.3% of the warnings we could verify came true.

Typical timing error was Β±1s (9 in 10 within 10s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?