Pontsarn level crossing

Automatic half-barrier level crossing on the Wales route (ELR SWM2).

predicted
OPEN
for the next 30 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 02:11–03:18 → 67m
Under the hood
Mon 07 Sep · 02:11
Today Tomorrow

Trains in window

02:22 🚛 6V02 Tees N.Y.Margam T.C. Up (N → S) no show
02:32 0V14 Eastleigh T.&R.S.M.DMargam T.C. Up (N → S) no show
🚛Freight Other
now 02:11:28 · 191 avg · 2 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,282 active · 21,043 delays · 2,870 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Pontsarn crossing is predicted to be closed for about 5 h 5 min between 06:00 and 22:00, across roughly 119 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:05–00:07, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:15–09:15 in the morning and around 17:27–18:27 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Pontsarn is a automatic half-barrier crossing (AHB) on the Down–Canton C.S.D. line (Wales route · ELR SWM2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,022 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.4% of the warnings we could verify came true.

Typical timing error was ±1s (9 in 10 within 19s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?