Blotoft level crossing

Manually-controlled barrier with obstacle detection level crossing on the East Midlands route (ELR SPD1).

predicted
OPEN
for 1 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚧 in 5 min · 12 min early

Next 30 min

OPEN 03:38–03:39 1m
CLOSED 03:39–03:43 4m
OPEN 03:43–04:29 → 46m
Under the hood
Thu 15 Oct · 03:38
Today Tomorrow

Trains in window

03:30 🚛 4L20 Masborough N&W GBRF → Felixstowe South GBRF Up (NW → SE) no show
03:43 🚧 6E04 Whitemoor Yard → Doncaster Up Decoy Down (SE → NW) -12 min
🚛Freight 🚧Engineering
now 03:38:18 · 124 avg · 2 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-14..2026-10-16
fetched 02:08:21
trust 32,503 active · 31,188 delays · 1,755 cancelled · 9 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Blotoft crossing is predicted to be closed for about 2 h 16 min between 06:00 and 22:00, across roughly 33 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.0 min (01:38–01:44, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:08–11:08 in the morning and around 14:09–15:09 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Old Forty Foot Bank in Lincolnshire.

Blotoft is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Peterborough North Yd GBRf–Sleaford line (East Midlands route · ELR SPD1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 366 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Full accuracy report →

Is this right?