Church Lane level crossing

Manually-controlled barrier with obstacle detection level crossing on the East Midlands route (ELR SPD1).

predicted
OPEN
for 18 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 21 min · 1 min early

Next 30 min

OPEN 06:36–06:55 18m
CLOSED 06:55–06:59 4m
OPEN 06:59–07:38 → 39m
Under the hood
Wed 11 Nov · 06:36
Today Tomorrow

Trains in window

06:58 🚆 2K01 Lincoln → Peterborough Up (NW → SE) approaching
06:59 🚆 2K90 Peterborough → Doncaster Down (SE → NW) -1 min
🚆Passenger
now 06:36:43 · 115 avg · 2 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,698 active · 31,211 delays · 1,992 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Church Lane crossing is predicted to be closed for about 2 h 14 min between 06:00 and 22:00, across roughly 32 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 5.2 min (01:40–01:45, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:51–07:51 in the morning and around 16:39–17:39 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Church End Drove near Quadring, Lincolnshire.

Church Lane is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Peterborough North Yd GBRf–Sleaford line (East Midlands route · ELR SPD1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 362 trains through this crossing.

99.7% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Full accuracy report →

Is this right?