Cheal Road level crossing

Manually-controlled barrier with obstacle detection level crossing on the East Midlands route (ELR SPD1).

predicted
OPEN
for 13 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš› in 17 min Β· scheduled

Next 30 min

OPEN 07:10–07:23 13m
CLOSED 07:23–07:31 8m
OPEN 07:31–07:52 β†’ 22m
Under the hood
Wed 11 Nov Β· 07:10
Today Tomorrow

Trains in window

07:23 πŸš› 4E08 London Gateway GBRF β†’ Wakefield Europort GBRF Down (S β†’ N) no show
07:27 πŸš› 4E14 Felixstowe North GBRF β†’ Doncaster Iport GBRF Down (S β†’ N) approaching
07:29 πŸš† 2K90 Peterborough β†’ Doncaster Down (S β†’ N) approaching
07:30 πŸš› 4E14 Felixstowe South GBRF β†’ Doncaster Iport GBRF Down (S β†’ N) -2 min
07:34 πŸš› 4L03 Doncaster Iport GBRF β†’ Felixstowe South GBRF Up (N β†’ S) no show
πŸš†Passenger πŸš›Freight
now 07:10:36 Β· 115 avg Β· 5 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,731 active Β· 31,241 delays Β· 2,034 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Cheal Road crossing is predicted to be closed for about 2 h 29 min between 06:00 and 22:00, across roughly 31 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.9 min (05:11–05:17, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:11–09:11 in the morning and around 19:19–20:19 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Cheal Road in Gosberton Cheal, Lincolnshire.

Cheal Road is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Peterborough North Yd GBRf–Sleaford line (East Midlands route · ELR SPD1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 363 trains through this crossing.

99.7% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?