Cherry Holt level crossing

Automatic half-barrier level crossing on the East Midlands route (ELR SPD1).

predicted
OPEN
for 53s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš› in 3 min Β· 22 min early

Next 30 min

OPEN 01:44–01:45 53s
CLOSED 01:45–01:47 2m
OPEN 01:47–01:52 6m
CLOSED 01:52–01:55 2m
OPEN 01:55–02:24 β†’ 29m
Under the hood
Fri 13 Nov Β· 01:44
Today Tomorrow

Trains in window

01:39 πŸš› 4D37 P'bro Westwood Sdgs GBRf β†’ Doncaster Down Decoy GBRF Down (S β†’ N) no show
01:47 πŸš› 4L39 Wakefield Europort GBRF β†’ Tilbury Container SRVS GB Up (N β†’ S) -22 min
01:51 πŸš› 4E28 Felixstowe South GBRF β†’ Doncaster Iport GBRF Down (S β†’ N) no show
01:54 πŸš› 4L88 Leeds F.L.T. β†’ London Gateway Frghtliner Up (N β†’ S) approaching
πŸš›Freight
now 01:44:24 Β· 119 avg Β· 4 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-11-11..2026-11-13
fetched 02:08:16
trust 33,900 active Β· 31,400 delays Β· 2,598 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Cherry Holt crossing is predicted to be closed for about 1 h 25 min between 06:00 and 22:00, across roughly 24 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:14–00:15, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:59–07:59 in the morning and around 17:17–18:17 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Cherry Holt Lane in Pinchbeck, Lincolnshire.

Cherry Holt is a automatic half-barrier crossing (AHB-X) on the Peterborough North Yd GBRf–Sleaford line (East Midlands route · ELR SPD1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 363 trains through this crossing.

99.7% of observed passes were being warned about on this page when they passed, and 99.5% of the warnings we could verify came true.

Typical timing error was Β±38s (9 in 10 within 77s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?