Brook Hall Road level crossing

CCTV-monitored manual barrier level crossing on the North West route (ELR HXS3).

predicted
CLOSED
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 2 min Β· 1 min late

Next 30 min

CLOSED 08:04–08:07 2m
OPEN 08:07–08:10 3m
CLOSED 08:10–08:13 3m
OPEN 08:13–08:17 4m
CLOSED 08:17–08:21 3m
OPEN 08:21–08:26 5m
CLOSED 08:26–08:29 3m
OPEN 08:29–08:32 3m
CLOSED 08:32–08:36 β†’ 3m
Under the hood
Mon 12 Oct Β· 08:04
Today Tomorrow

Trains in window

07:59 πŸš† 2S06 Liverpool Central (Northern) β†’ Southport Down (SE β†’ NW) on time
08:06 πŸš† 2G08 Southport β†’ Liverpool Central (Northern) Up (NW β†’ SE) approaching
08:13 πŸš† 2S07 Liverpool Central (Northern) β†’ Southport Down (SE β†’ NW) approaching
08:20 πŸš† 2G09 Southport β†’ Liverpool Central (Northern) Up (NW β†’ SE) on time
08:29 πŸš† 2S08 Liverpool Central (Northern) β†’ Southport Down (SE β†’ NW) active
08:35 πŸš† 2G10 Southport β†’ Liverpool Central (Northern) Up (NW β†’ SE) active
πŸš†Passenger
now 08:04:47 Β· 121 avg Β· 6 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,916 active Β· 26,512 delays Β· 2,598 cancelled Β· 0 reconnects
Nearby crossings

All 148 crossings in North West and Central β†’

About this crossing

How often it closes

On today’s timetable, Brook Hall Road crossing is predicted to be closed for about 9 h 37 min between 06:00 and 22:00, across roughly 128 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 9.4 min (07:25–07:34, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:16–07:16 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Brooke Road East in Crosby, Merseyside.

Brook Hall Road is a CCTV-monitored manual barrier crossing (CCTV) on the Sandhills–Southport C.H.S. line (North West route · ELR HXS3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 960 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was Β±4s (9 in 10 within 15s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.