Burton Agnes level crossing

Automatic half-barrier level crossing on the North and East route (ELR HBS).

predicted
OPEN
for 13 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 13 min · running

Next 30 min

OPEN 17:32–17:45 13m
CLOSED 17:45–17:46 2m
OPEN 17:46–17:56 9m
CLOSED 17:56–17:57 2m
OPEN 17:57–18:00 2m
CLOSED 18:00–18:01 2m
OPEN 18:01–18:12 → 11m
Under the hood
Thu 08 Oct · 17:32
Today Tomorrow

Trains in window

17:45 🚄 1J52 Scarborough → Sheffield Up (NE → SW) no reports
17:46 🚆 2R21 York → Bridlington Down (SW → NE) +11 min
17:57 🚄 1W48 Sheffield → Scarborough Down (SW → NE) +2 min
18:01 🚆 2R76 Bridlington → York Up (NE → SW) active
🚄Express passenger 🚆Passenger
now 17:32:22 · 74 avg · 4 in window
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,664 active · 32,049 delays · 2,190 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Burton Agnes crossing is predicted to be closed for about 2 h 32 min between 06:00 and 22:00, across roughly 66 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:01–09:01 in the morning and around 17:53–18:53 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Burton Agnes is a automatic half-barrier crossing (AHB-X) on the Beverley–Scarborough line (North and East route · ELR HBS). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?