Buttisland level crossing

User-worked with stop lights level crossing on the Western route (ELR DAC).

predicted
OPEN
for 13 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 14 min · 1 min early

Next 30 min

OPEN 06:38–06:52 13m
CLOSED 06:52–06:52 50s
OPEN 06:52–07:40 → 47m
Under the hood
Wed 11 Nov · 06:38
Today Tomorrow

Trains in window

06:52 🚆 2K01 Exeter St. David's → Okehampton Down (E → W) -1 min
🚆Passenger
now 06:38:31 · 30 avg · 1 in window
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,701 active · 31,212 delays · 1,997 cancelled · 0 reconnects
About this crossing

How often it closes

On today’s timetable, Buttisland crossing is predicted to be closed for about 47 min between 06:00 and 22:00, across roughly 29 closures. The longest single predicted closure is 1 minute. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:43–11:43 in the morning and around 14:59–15:59 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is near Bow, Devon.

Buttisland is a user-worked with stop lights crossing (UWCMSL) on the Taunton–Okehampton line (Western route · ELR DAC). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?