Chain Bridge Cottage (uwc) level crossing

User-worked with stop lights level crossing on the North and East route (ELR MBW3).

predicted
OPEN
for 8 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 9 min · on time

Next 30 min

OPEN 07:01–07:09 8m
CLOSED 07:09–07:09 50s
OPEN 07:09–07:28 18m
CLOSED 07:28–07:29 50s
OPEN 07:29–08:14 → 45m
Under the hood
Wed 11 Nov · 07:01
Today Tomorrow

Trains in window

07:09 🚆 2E01 Middlesbrough → Whitby Down (SW → NE) on time
07:29 🚆 2W09 Whitby → Newcastle Up (NE → SW) active
🚆Passenger
now 07:01:10 · 12 avg · 2 in window
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,723 active · 31,235 delays · 2,027 cancelled · 0 reconnects
About this crossing

How often it closes

On today’s timetable, Chain Bridge Cottage (uwc) crossing is predicted to be closed for about 17 min between 06:00 and 22:00, across roughly 11 closures. The longest single predicted closure is 1 minute. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:30–07:30 in the morning and around 18:48–19:48 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Ruswarp, North Yorkshire.

Chain Bridge Cottage (uwc) is a user-worked with stop lights crossing (UWCMSL) on the Nunthorpe–Whitby line (North and East route · ELR MBW3). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?