Church Street level crossing

Automatic half-barrier level crossing on the Anglia route (ELR LTN1).

right now
OPEN
for 2 min
next: 🚄 in 7 min · 6 min late

Next 30 min

OPEN 01:18–01:20 2m
CLOSED 01:20–01:22 2m
OPEN 01:22–01:24 2m
CLOSED 01:24–01:27 3m
OPEN 01:27–01:41 14m
CLOSED 01:41–01:43 2m
OPEN 01:43–02:37 → 54m
Under the hood
Fri 24 Jul · 01:18
Today Tomorrow

Trains in window

01:25 1F82 🚄 LIVST → CLCHSTR ← from Witham approaching
01:27 6V84 🚛 IPSWGWF → STKGFHH → from Marks Tey active
01:43 1F84 🚄 LIVST → CLCHSTR ← from Witham +3 min
🚄Express passenger 🚛Freight
now 01:18:57 · 252 avg · 3 in window
lx berths down: Q2/0769→Q2/[email protected] · down: Q2/0771→Q2/[email protected] · down: Q2/0773→Q2/[email protected] · up: Q2/0832→Q2/[email protected] · up: Q2/0846→Q2/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,127 delays · 1,796 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Church Street crossing is predicted to be closed for about 5 h 47 min between 06:00 and 22:00, across roughly 127 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.6 min (00:07–00:10, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:29–08:29 in the morning and around 16:46–17:46 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Church Street is a automatic half-barrier crossing (AHB) on the Witham–Marks Tey line (Anglia route · ELR LTN1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 11 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.

Typical timing error was ±103s (9 in 10 within 416s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?