Automatic barrier locally monitored level crossing on the Anglia route (ELR SUD).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 01:23 | 🚧 3S30 | Stowmarket DGL → Stowmarket DGL Down (N → S) | -29 min |
On today’s timetable, Cornard crossing is predicted to be closed for about 1 h 4 min between 06:00 and 22:00, across roughly 32 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:20–09:20 in the morning and around 16:28–17:28 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Dove House Meadow in Great Cornard, Suffolk.
Cornard is a automatic barrier locally monitored crossing (ABCL) on the Witham–Marks Tey line (Anglia route · ELR SUD). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 130 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.