Coundon Road level crossing

CCTV-monitored manual barrier level crossing on the Central route (ELR CNN).

predicted
CLOSED
for 45s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† now Β· 2 min late

Next 30 min

CLOSED 09:59–10:00 45s
OPEN 10:00–10:52 β†’ 52m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:54 πŸš† 2G72 Nuneaton β†’ Leamington Spa Up (NE β†’ SW) passed
10:00 πŸš† 2G73 Leamington Spa β†’ Nuneaton Down (SW β†’ NE) approaching
πŸš†Passenger
now 09:59:44 Β· 65 avg Β· 2 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 148 crossings in North West and Central β†’

About this crossing

How often it closes

On today’s timetable, Coundon Road crossing is predicted to be closed for about 2 h 14 min between 06:00 and 22:00, across roughly 17 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:03–00:06, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 13:27–14:27 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Coundon Road in Coventry, West Midlands.

Coundon Road is a CCTV-monitored manual barrier crossing (CCTV) on the Coventry Yard–Rugby line (Central route · ELR CNN). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 146 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was Β±23s (9 in 10 within 40s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?