Crabtree UWCmwl level crossing

Miniature warning light level crossing on the North West route (ELR WBS3).

predicted
CLOSED
for 1 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 1 min · on time

Next 30 min

CLOSED 07:28–07:29 1m
MAY OPEN 07:29–07:30 33s
CLOSED 07:30–07:33 3m
OPEN 07:33–08:12 → 39m
Under the hood
Tue 06 Oct · 07:28
Today Tomorrow

Trains in window

07:18 🚆 2O71 Southport → Manchester Oxford Road Up (NW → SE) +2 min
07:29 🚆 2W02 Manchester Victoria → Southport Down (SE → NW) on time
07:33 🚆 2W44 Southport → Stalybridge Up (NW → SE) approaching
🚆Passenger
now 07:28:07 · 69 avg · 3 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,411 active · 31,718 delays · 1,707 cancelled · 0 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Crabtree UWCmwl crossing is predicted to be closed for about 4 h 12 min between 06:00 and 22:00, across roughly 54 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (06:00–06:04, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:40–09:40 in the morning and around 12:40–13:40 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Crabtree UWCmwl is a miniature warning light crossing (MWLG) on the Wigan Wallgate C.S.–Southport line (North West route · ELR WBS3). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 413 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.8% of the warnings we could verify came true.

Full accuracy report →

Is this right?