Automatic half-barrier level crossing on the North West route (ELR WBS3).
| No trains in the next 30 minutes. |
On today’s timetable, Dean Lane crossing is predicted to be closed for about 2 h 44 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:00–07:00 in the morning and around 13:20–14:20 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Dean Lane is a automatic half-barrier crossing (AHB-X) on the Wigan Wallgate C.S.–Southport line (North West route · ELR WBS3). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway.