Dean Lane level crossing

Automatic half-barrier level crossing on the North West route (ELR WBS3).

right now
OPEN
for at least 2h

Next 30 min

OPEN 01:17–03:17+ 2h+
Under the hood
Fri 24 Jul · 01:17
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 01:17:09 · 63 avg · 0 in window
lx berths up: SS/B103→SS/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,126 delays · 1,796 cancelled · 0 reconnects
Nearby crossings

All 154 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Dean Lane crossing is predicted to be closed for about 2 h 44 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 13:20–14:20 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Dean Lane is a automatic half-barrier crossing (AHB-X) on the Wigan Wallgate C.S.–Southport line (North West route · ELR WBS3). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.