Chapel Lane level crossing

Manually-controlled barrier with obstacle detection level crossing on the North West route (ELR WBS3).

predicted
OPEN
for 1 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 4 min Β· 7 min late

Next 30 min

OPEN 09:53–09:54 1m
CLOSED 09:54–09:57 3m
OPEN 09:57–10:02 5m
CLOSED 10:02–10:05 3m
OPEN 10:05–10:20 14m
CLOSED 10:20–10:24 β†’ 4m
Under the hood
Sat 17 Oct Β· 09:53
Today Tomorrow

Trains in window

09:57 πŸš† 2W48 Southport β†’ Stalybridge Up (NW β†’ SE) +7 min
10:05 πŸš† 2W07 Stalybridge β†’ Southport Down (SE β†’ NW) +1 min
10:23 πŸš† 2O74 Southport β†’ Manchester Oxford Road Up (NW β†’ SE) active
10:24 πŸš† 2W08 Manchester Oxford Road β†’ Southport Down (SE β†’ NW) +2 min
πŸš†Passenger
now 09:53:12 Β· 52 avg Β· 4 in window
timetable cif full+upd 2026-10-16..2026-10-18
fetched 02:08:22
trust 41,252 active Β· 36,611 delays Β· 2,774 cancelled Β· 0 reconnects
Nearby crossings

All 148 crossings in North West and Central β†’

About this crossing

How often it closes

On today’s timetable, Chapel Lane crossing is predicted to be closed for about 3 h 44 min between 06:00 and 22:00, across roughly 49 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:05–07:05 in the morning and around 20:55–21:55 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Chapel Lane in Parbold, Lancashire.

Chapel Lane is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Wigan Wallgate C.S.–Southport line (North West route · ELR WBS3). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?