Crundale level crossing

Automatic half-barrier level crossing on the Wales route (ELR SWM2).

right now
OPEN
for 19 min
next: 🚛 in 20 min · 6 min late

Next 30 min

OPEN 01:12–01:31 19m
CLOSED 01:31–01:32 2m
OPEN 01:32–03:01 → 89m
Under the hood
Fri 24 Jul · 01:12
Today Tomorrow

Trains in window

01:23 0V13 MRGMTC → ROBSTNS ← from Llanelli no show
01:32 6B47 🚛 WSTLGHM → ROBSTNS ← from Llanelli +6 min
🚛Freight Other
now 01:12:17 · 37 avg · 2 in window
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,086 active · 30,124 delays · 1,796 cancelled · 0 reconnects
Nearby crossings

All 228 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Crundale crossing is predicted to be closed for about 51 min between 06:00 and 22:00, across roughly 21 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:27–11:27 in the morning and around 13:28–14:28 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Crundale is a automatic half-barrier crossing (AHB) on the Llanelli–Johnston line (Wales route · ELR SWM2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?