Crundale level crossing

Automatic half-barrier level crossing on the Wales route (ELR SWM2).

predicted
OPEN
for the next 30 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 09:25–10:18 → 53m
Under the hood
Sat 17 Oct · 09:25
Today Tomorrow

Trains in window

09:23 🚄 1E18 Milford Haven → Swansea Down (NE → SW) +1 min
🚄Express passenger
now 09:25:35 · 28 avg · 1 in window
timetable cif full+upd 2026-10-16..2026-10-18
fetched 02:08:22
trust 40,626 active · 36,082 delays · 2,691 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Crundale crossing is predicted to be closed for about 57 min between 06:00 and 22:00, across roughly 21 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 12:22–13:22 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Crundale, Pembrokeshire.

Crundale is a automatic half-barrier crossing (AHB) on the Whitland–Johnston line (Wales route · ELR SWM2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?