Denver level crossing

Automatic half-barrier level crossing on the Anglia route (ELR BGK).

predicted
OPEN
for 12 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 13 min · 1 min early

Next 30 min

OPEN 04:56–05:07 12m
CLOSED 05:07–05:09 2m
OPEN 05:09–05:29 → 20m
Under the hood
Mon 07 Sep · 04:56
Today Tomorrow

Trains in window

05:09 🚄 1T01 Kings LynnLondon Kings Cross Up (N → S) approaching
🚄Express passenger
now 04:56:02 · 52 avg · 1 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,724 active · 21,567 delays · 2,955 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Denver crossing is predicted to be closed for about 1 h 54 min between 06:00 and 22:00, across roughly 45 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:55–00:56, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:49–07:49 in the morning and around 18:32–19:32 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Denver is a automatic half-barrier crossing (AHB) on the Ely–Kings Lynn CS line (Anglia route · ELR BGK). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 211 trains through this crossing.

99.5% of observed passes were being warned about on this page when they passed, and 85.7% of the warnings we could verify came true.

Typical timing error was ±19s (9 in 10 within 503s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?