Flamborough level crossing

Automatic half-barrier level crossing on the North and East route (ELR HBS).

predicted
OPEN
for at least 2h

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 21:55–23:55+ 2h+
Under the hood
Thu 22 Oct · 21:55
Today Tomorrow

Trains in window

21:54 🚄 1J56 Scarborough → Hull Up (N → S) +5 min
🚄Express passenger
now 21:55:47 · 33 avg · 1 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,914 active · 32,033 delays · 2,400 cancelled · 9 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Flamborough crossing is predicted to be closed for about 1 h 13 min between 06:00 and 22:00, across roughly 30 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:16–08:16 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Jewison Lane near Marton, East Riding of Yorkshire.

Flamborough is a automatic half-barrier crossing (AHB) on the Bridlington–Scarborough line (North and East route · ELR HBS). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?