Gillingham Station level crossing

Signal-box-controlled level crossing on the Wessex route (ELR BAE2).

predicted
OPEN
for 14 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 17 min · 1 min early

Next 30 min

OPEN 07:12–07:26 14m
CLOSED 07:26–07:29 3m
OPEN 07:29–08:08 → 38m
Under the hood
Mon 07 Sep · 07:12
Today Tomorrow

Trains in window

07:29 🚄 1L24 Exeter St. David'sLondon Waterloo Up (W → E) approaching
07:45 🚧 3S82 Totton YardTotton Yard Down (E → W) no show
🚄Express passenger 🚧Engineering
now 07:12:48 · 42 avg · 2 in window
live observation: 1 up · 2 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,149 active · 25,046 delays · 3,032 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Gillingham Station crossing is predicted to be closed for about 2 h 13 min between 06:00 and 22:00, across roughly 33 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (01:31–01:34, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 19:37–20:37 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Gillingham Station is a signal-box-controlled crossing (SBC) on the Salisbury–Templecombe line (Wessex route · ELR BAE2). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 274 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±121s (9 in 10 within 207s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?