Glan-y-Mor Elias level crossing

User-worked with stop lights level crossing on the Wales route (ELR CNH3).

predicted
OPEN
for 30 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚧 in 30 min · 11 min late

Next 30 min

OPEN 10:00–10:30 30m
CLOSED 10:30–10:31 → 50s
Under the hood
Thu 22 Oct · 10:00
Today Tomorrow

Trains in window

10:03 🚄 1T32 Warrington Bank Quay → Holyhead Down (NE → SW) no show
10:04 🚄 1D32 Manchester Airport → Holyhead Down (NE → SW) cancelled
10:31 🚧 3S71 Coleham LMD → Coleham LMD Down (NE → SW) +11 min
🚄Express passenger 🚧Engineering
now 10:00:57 · 71 avg · 3 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active · 31,699 delays · 1,966 cancelled · 9 reconnects
About this crossing

How often it closes

On today’s timetable, Glan-y-Mor Elias crossing is predicted to be closed for about 1 h 43 min between 06:00 and 22:00, across roughly 58 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:39–11:39 in the morning and around 19:45–20:45 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Llanfairfechan, Conwy.

Glan-y-Mor Elias is a user-worked with stop lights crossing (UWCMSL) on the Llandudno Junction–Bodorgan line (Wales route · ELR CNH3). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?