Automatic barrier locally monitored level crossing on the Anglia route (ELR ESK).
| No trains in the next 30 minutes. |
On today’s timetable, Grove Road crossing is predicted to be closed for about 57 min between 06:00 and 22:00, across roughly 18 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:00–07:00 in the morning and around 16:16–17:16 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Grove Road is a automatic barrier locally monitored crossing (ABCL) on the Woodbridge–Oulton Broad South line (Anglia route · ELR ESK). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 120 trains through this crossing.
99.2% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±65s (9 in 10 within 197s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.