Hammerton Station level crossing

Manual gate level crossing on the North and East route (ELR HAY1).

predicted
CLOSED
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 2 min Β· 2 min late

Next 30 min

CLOSED 10:00–10:02 2m
OPEN 10:02–10:04 2m
CLOSED 10:04–10:07 3m
OPEN 10:07–10:26 19m
CLOSED 10:26–10:29 3m
OPEN 10:29–10:31 β†’ 2m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

10:02 πŸš† 2C17 York β†’ Leeds Down (E β†’ W) +2 min
10:07 πŸš† 2C12 Leeds β†’ York Up (W β†’ E) +3 min
10:29 πŸš† 2C19 York β†’ Leeds Down (E β†’ W) active
πŸš†Passenger
now 10:00:05 Β· 62 avg Β· 3 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Hammerton Station crossing is predicted to be closed for about 4 h 9 min between 06:00 and 22:00, across roughly 57 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:02–10:02 in the morning and around 12:02–13:02 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Kirk Hammerton, North Yorkshire, next to Hammerton station.

Hammerton Station is a manual gate crossing (MGH) on the Poppleton–Harrogate line (North and East route · ELR HAY1). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?