Level level crossing on the Scotland route (ELR ECN3).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 10:09 | π 1B74 | Aberdeen β Edinburgh Up (E β W) | +2 min |
| 10:27 | π 2L60 | Arbroath β Dundee Up (E β W) | on time |
| 10:46 | π 1T26 | Aberdeen β Glasgow Queen St High Level Up (E β W) | on time |
On todayβs timetable, HARECRAIG Footpath crossing is predicted to be closed for about 2 h 7 min between 06:00 and 22:00, across roughly 71 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:10β07:10 in the morning and around 16:55β17:55 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on a footpath near Tayport, Dundee.
HARECRAIG Footpath is a level crossing (MSL) on the Camperdown JnβArbroath line (Scotland route · ELR ECN3). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β