User-worked with stop lights level crossing on the Anglia route (ELR EMP).
| 01:12 | 6L64 | 🚛 | MNKBRRG → MARCHUG | → from Peterborough | -20 min |
| 01:15 | 1C74 | 🚄 | KNGX → CAMBDGE | → from Peterborough | +6 min |
| 01:30 | 3S20 | 🚧 | BROXGBF → BROXGBF | → from Peterborough | no show |
| 01:32 | 6L63 | 🚛 | BRBDGBR → MARCHUG | → from Peterborough | no show |
| 01:39 | 4E46 | 🚛 | FLXSNEW → NORMPW | ← from March Up Yard GBRF | -22 min |
On today’s timetable, Harts Drove crossing is predicted to be closed for about 6 h 48 min between 06:00 and 22:00, across roughly 189 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:34–07:34 in the morning and around 16:58–17:58 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Harts Drove is a user-worked with stop lights crossing (UWCMSL) on the March Up Yard GBRF–Peterborough line (Anglia route · ELR EMP). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →