Haughley level crossing

Automatic half-barrier level crossing on the Anglia route (ELR LTN1).

predicted
CLOSED
for 4s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 6 min · on time

Next 30 min

CLOSED 07:13–07:13 4s
OPEN 07:13–07:18 5m
CLOSED 07:18–07:19 2m
OPEN 07:19–07:24 5m
CLOSED 07:24–07:26 2m
OPEN 07:26–07:34 9m
CLOSED 07:34–07:36 2m
OPEN 07:36–07:42 6m
CLOSED 07:42–07:43 → 2m
Under the hood
Mon 07 Sep · 07:13
Today Tomorrow

Trains in window

07:12 🚆 2W04 IpswichCambridge Down (S → N) passed
07:19 🚄 1P02 London Liverpool StreetNorwich Down (S → N) approaching
07:25 🚄 1P13 NorwichLondon Liverpool Street Up (N → S) on time
07:36 🚆 2W50 IpswichCambridge Down (S → N) active
07:43 🚆 2W05 CambridgeIpswich Up (N → S) +1 min
🚄Express passenger 🚆Passenger
now 07:13:05 · 183 avg · 5 in window
live observation: 0 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,152 active · 25,052 delays · 3,031 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Haughley crossing is predicted to be closed for about 4 h 28 min between 06:00 and 22:00, across roughly 110 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:45–00:46, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 17:11–18:11 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Haughley is a automatic half-barrier crossing (AHB) on the Stowmarket–Diss line (Anglia route · ELR LTN1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 522 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.

Typical timing error was ±7s (9 in 10 within 156s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?