Hauxton Road level crossing

Automatic half-barrier level crossing on the Anglia route (ELR SBR).

right now
OPEN
for 26 min
next: 🚄 in 28 min · 1 min late

Next 30 min

OPEN 01:15–01:42 26m
CLOSED 01:42–01:43 2m
OPEN 01:43–03:15+ 1h+
Under the hood
Fri 24 Jul · 01:15
Today Tomorrow

Trains in window

01:12 1C74 🚄 KNGX → CAMBDGE ← from Barrington PAD GBRF +6 min
01:30 3S20 🚧 BROXGBF → BROXGBF → from Shelford no show
01:43 1C76 🚄 KNGX → CAMBDGE ← from Barrington PAD GBRF +1 min
🚄Express passenger 🚧Engineering
now 01:15:47 · 376 avg · 3 in window
lx berths down: CA/0117→CA/[email protected] · up: CA/0118→CA/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,126 delays · 1,797 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Hauxton Road crossing is predicted to be closed for about 9 h 52 min between 06:00 and 22:00, across roughly 158 closures. The longest single predicted closure is 11 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:01–00:03, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:30–09:30 in the morning and around 15:26–16:26 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Hauxton Road is a automatic half-barrier crossing (AHB) on the Barrington PAD GBRF–Shelford line (Anglia route · ELR SBR). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 16 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 97.2% of the warnings we could verify came true.

Typical timing error was ±29s (9 in 10 within 142s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?