Harston level crossing

Automatic half-barrier level crossing on the Anglia route (ELR SBR).

predicted
OPEN
for 16 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 16 min Β· 6 min late

Next 30 min

OPEN 07:39–07:55 16m
CLOSED 07:55–07:56 1m
OPEN 07:56–07:58 2m
CLOSED 07:58–08:01 3m
OPEN 08:01–08:03 2m
CLOSED 08:03–08:04 1m
OPEN 08:04–08:25 β†’ 21m
Under the hood
Mon 12 Oct Β· 07:39
Today Tomorrow

Trains in window

07:30 πŸš† 2C02 London Kings Cross β†’ Cambridge Down (SW β†’ NE) +5 min
07:33 πŸš„ 9S11 Cambridge β†’ Brighton Up (NE β†’ SW) +4 min
07:36 πŸš„ 9S00 Brighton β†’ Cambridge Down (SW β†’ NE) +5 min
07:37 πŸš„ 1C87 Cambridge β†’ London Kings Cross Up (NE β†’ SW) passed
07:39 πŸš„ 1T06 London Kings Cross β†’ Kings Lynn Down (SW β†’ NE) passed
07:55 πŸš„ 1T09 Kings Lynn β†’ London Kings Cross Up (NE β†’ SW) +6 min
07:59 πŸš„ 9S13 Cambridge β†’ Brighton Up (NE β†’ SW) active
07:59 πŸš† 2C04 London Kings Cross β†’ Cambridge Down (SW β†’ NE) +2 min
08:01 πŸš„ 9S02 Brighton β†’ Cambridge Down (SW β†’ NE) on time
08:03 πŸš„ 1C89 Cambridge β†’ London Kings Cross Up (NE β†’ SW) active
08:05 πŸš„ 1T08 London Kings Cross β†’ Kings Lynn Down (SW β†’ NE) cancelled
πŸš„Express passenger πŸš†Passenger
now 07:39:28 Β· 179 avg Β· 11 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,835 active Β· 25,862 delays Β· 2,559 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Harston crossing is predicted to be closed for about 5 h 38 min between 06:00 and 22:00, across roughly 105 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 2.6 min (06:34–06:36, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:26–09:26 in the morning and around 17:26–18:26 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Harston, Cambridgeshire.

Harston is a automatic half-barrier crossing (AHB) on the Shepreth–Cambridge line (Anglia route · ELR SBR). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 1,286 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.9% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?