CCTV-monitored manual barrier level crossing on the Anglia route (ELR SBR).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:52 | π 2C12 | London Kings Cross β Cambridge Down (SW β NE) | +3 min |
| 10:00 | π 9S10 | Brighton β Cambridge Down (SW β NE) | passed |
| 10:03 | π 1T17 | Kings Lynn β London Kings Cross Up (NE β SW) | approaching |
| 10:07 | π 9S21 | Cambridge β Brighton Up (NE β SW) | +5 min |
| 10:09 | π 1T16 | London Kings Cross β Ely Down (SW β NE) | +8 min |
| 10:09 | π§ 3S81 | Broxbourne Dn Tamp Sdg GBf β Broxbourne Dn Tamp Sdg GBf Up (NE β SW) | +58 min |
| 10:10 | π 2C23 | Cambridge β London Kings Cross Up (NE β SW) | +1 min |
| 10:21 | π 1T19 | Ely β London Kings Cross Up (NE β SW) | active |
| 10:32 | π 1T18 | London Kings Cross β Kings Lynn Down (SW β NE) | +1 min |
| 10:32 | π 9S23 | Cambridge β Brighton Up (NE β SW) | active |
On todayβs timetable, Shepreth Station crossing is predicted to be closed for about 8 h 38 min between 06:00 and 22:00, across roughly 139 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 18.2 min (07:22–07:40, 6 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 08:36β09:36 in the morning and around 19:55β20:55 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Station Road in Shepreth, Cambridgeshire, next to the station.
Shepreth Station is a CCTV-monitored manual barrier crossing (CCTV) on the RoystonβFoxton line (Anglia route · ELR SBR). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 1,286 trains through this crossing.
99.5% of observed passes were being warned about on this page when they passed, and 98.3% of the warnings we could verify came true.